Weather | Beachcam
Login | Contact Us | Staff | Site Map | Archives | Alerts | Electronic Edition | Subscribe to the paper

HomeNewsLocal News

Ojai bridge repair plan altered to halt closure

Project is expected to take 2 years instead of 6 months


Download Podcast  Download this story as a podcast!
Joseph A. Garcia / Star staff
Jesus Seja, 11, of Ojai, waits for traffic to clear on the San Antonio Creek Bridge before crossing. "It's kind of scary, it's too small for people to walk on," he said. Caltrans has agreed to redesign a widening project so a lane remains open during repairs.

Joseph A. Garcia / Star staff Jesus Seja, 11, of Ojai, waits for traffic to clear on the San Antonio Creek Bridge before crossing. "It's kind of scary, it's too small for people to walk on," he said. Caltrans has agreed to redesign a widening project so a lane remains open during repairs.

Order Photos

Caltrans officials have agreed to redesign repairs to San Antonio Creek Bridge in Ojai so traffic won't be diverted into neighborhoods.

The replacement and widening project on the Highway 150 bridge will be constructed in two phases so a single lane of the highway will remain open throughout construction.

"It's nice to see Caltrans is responsive to our concerns," Ojai City Manager Jere Kersnar said.

Caltrans had proposed detouring traffic off the highway using Gridley Road, Grand Avenue and Gorham Road, angering many residents along those roads who protested to city leaders about the increased traffic.

The debate came to a head last month when city leaders, convinced Caltrans could do the work without the detour, sent a letter to the state agency saying it didn't have city permission to use those city streets.

In a response letter that arrived last week, Caltrans agreed to cancel a bid opening scheduled for this month and redesign the project.

"We have been working closely and cooperatively with the city to work out a solution," Caltrans spokeswoman Jeanne Bonfilio said.

A new construction schedule, however, has not yet been determined. A phased project, to cost around $5 million, could take up to two years, officials said. The original plan was to take six months.

"I'm glad they are going to fix it, but now we are looking at two years of construction time, which is disheartening," said Patricia Hartmann, whose property abuts the bridge on both sides. She and her husband predict drivers will use the detour route anyway once construction begins and the highway is limited to one lane.

An estimated 5,000 to 10,000 vehicles cross each day over the 90-year-old bridge.

Caltrans officials say the concrete is fatigued, and the narrow bridge presents a safety issue for cyclists and pedestrians.

Parts of the bridge have fallen off, and heavy winter storms in January 2005 exposed several support legs. Some fear it could give out during a major flood.

The Hartmanns have watched a quarter-acre of their property wash away during past storms when rocks and debris backed up under the bridge, forcing water onto their land.

Others, however, argued at city meetings that the bridge is just fine. They said transportation officials should leave it alone and fix other, more congested roads in the Ojai Valley.

Ojai Mayor Sue Horgan said the aging bridge needs to be replaced but does not believe it will take two years to fix. "That's not acceptable," she said.

Councilman Joe De Vito agreed the width is substandard and unsafe for pedestrians. He has heard of many close calls when opposing vehicles try to cross at the same time.

"Not everyone is going to be happy," he said of the outcome. "But Caltrans has the money to do this, and I am glad to see the project didn't drop off its to-do list."

Discussions

Posted by rebel123 on December 14, 2007 at 1:54 p.m. (Suggest removal)

The mewling few have won again. This is a dangerous "solution" to the whining from neighbors who complain that their bucolic lives would be disrupted by traffic diverted down their street if the bridge was closed. One lane on a bridge that serves two lane traffic seems a very dangerous thing. Next will be the law suit when someone is killed in a head on collision there or run over by a car jogging like the person in the picture when there's no room to pass. I love Ojai, but I am so very sick and tired of the entitlement that some people there seem to feel. The bridge needs to be fixed. Put on your big girl/boy panties and deal with it!



Discuss this article
(Requires free registration.)

Article discussions on this site are to support community debates of issues related to our stories and editorials.

Discussions should not stray from the subject of the story or editorial.

We do not allow the following:

  • Posts that degrade others on the basis of gender, race, class, ethnicity, national origin, religion, sexual orientation or disability.
  • Disparaging remarks, abusive language or obscene comments.
  • Threats, whether obvious or veiled.

We reserve the right to delete threads and/or ban users for these or other reasons we deem necessary.

Opinions are the sole responsibility of the person posting them. You agree not to post comments that are off topic, defamatory, obscene, abusive, threatening or an invasion of privacy. Violators may be banned. Click here for our full user agreement.

Username:

Password:
(Forgotten your password?)

Your Turn:

Loading videos... If you don't see them shortly, you may need to download the Flash Player.